Supply & install or install only — wall split, ceiling cassette, or ducted. Every installation includes full copper piping confirmation, proper drainage, electrical wiring, vacuum, gas charge, and a complete test run before we leave.
供应及安装或纯安装服务均可 — 分体壁挂式、天花卡式或内藏式风管机。每次安装包括铜管走线确认、排水、电气配线、抽真空、充冷媒及完整测试,确认正常运作后才完工。
Price is for installation labour. If you need us to supply the unit as well, WhatsApp us with your room size and we'll recommend the right model and capacity.
以下为安装人工费。若需我们代购冷气机,请WhatsApp告知房间尺寸,我们将推荐合适的型号及匹数。
壁挂式分体冷气
天花卡式机
内藏式风管机
Every installation we carry out covers these steps — not as extras, but as standard. We double-confirm copper piping routing before sealing so you don't have problems later.
以下每个步骤都是我们每次安装的标准流程,而非额外收费项目。我们会在封管前再次确认铜管走线,确保日后不出问题。
Before drilling anything, we plan the copper piping route and confirm with you — shortest run, neatest finish, no blind spots.
Wall bracket drilled and secured level. Indoor unit mounted correctly — not tilted, not loose.
Copper piping run from indoor to outdoor unit, insulated throughout. Route double-confirmed before any sealing or casing work.
Proper drain pipe gradient confirmed — water drains away from the unit, not back into it. Drain pump added where gravity drainage isn't possible.
Wiring from DB to outdoor unit and indoor unit. Isolator switch installed at the outdoor unit as required.
Outdoor condensing unit positioned for proper airflow clearance, secured on bracket or anti-vibration pads.
System vacuumed to remove moisture and air. Pressure held to confirm the piping is leak-free before refrigerant is added.
Refrigerant charged to manufacturer specification. Full test run — cooling temperature, drainage flow, and no abnormal noise confirmed before we leave.
We're flexible. Buy your own unit from any retailer and we'll install it, or let us handle the supply and installation together.
A poor installation causes problems for years — water leaks, poor cooling, noisy operation, and premature compressor failure. We do it properly from the start.
We double-confirm the copper piping route with you before closing any walls or ceiling. No surprises after the job is done.
A wrongly angled drain pipe is the #1 cause of water leaking indoors. We confirm drainage gradient before finishing — not after.
We vacuum the system before charging refrigerant — removing moisture that causes compressor damage over time. Many cheap installers skip this step.
If any installation-related issue arises within 3 months — water leak, loose connection, drainage problem — we come back and fix it at no charge.
Every installation comes with a 3-month workmanship warranty. If any issue arises from our installation work within 3 months, we return and fix it free of charge.
所有安装工程均附带3个月施工保修。若安装后3个月内出现任何与安装工艺相关的问题,我们将免费回来处理。
A standard wall split unit installation takes 2–4 hours. Ceiling cassette and ducted units take longer — typically half a day. Multiple units in the same visit are scheduled as a full-day job.
Clear the area around where the indoor unit will be mounted. If you have a false ceiling, confirm access panel locations with your ID or contractor beforehand. For ceiling cassette and ducted, ceiling opening work should be completed before our visit unless we're handling that too.
Yes — we have experience with high-rise residential installations. For outdoor unit placement above ground floor, we'll assess the bracket position and safety requirements during the site visit.
All major brands — Daikin, Panasonic, Mitsubishi, Samsung, LG, Midea, Acson, York, Carrier, Haier, and more. If you're buying your own unit, just share the model with us before the visit.
The installation price range covers standard HP sizes (1.0HP to 2.5HP for wall split). Larger units or installations requiring longer pipe runs, additional trunking, or difficult access may be quoted higher — confirmed during site survey.
Tell us the unit type, how many units, and your location. We'll confirm availability, advise on piping routes if needed, and give you a fixed quote before we start.